Lift Station 5 Rehabilitation - The Villages, FL

Lift station

Project Description

RCM Utilities recently completed a Lift Station Rehabilitation project, providing all necessary materials, equipment, and labor. The project involved:

  • Extensive excavation for a temporary pump-off connection.
  • Installation of a permanent isolation plug valve.
  • A duplex diesel bypass pumping system.

The scope included demolishing and removing existing components and setting a new precast concrete top slab with an aluminum hatch cover. The concrete wet well substrate was prepared with high-pressure hydro blasting before installing a SEWPERCOAT wet well lining system.  In addition the electrical service for the lift station was updated.  RCM Utilities successfully completed the Lift Station Rehabilitation, delivering a fully upgraded and efficient system.

Client:

The Villages

Location:

Marion, FL 

Category:

Lift Station Rehabilitation 

Timeline

2 Weeks

Lift station
Lift station